Peter Hick's Class 222s gangway and wire connections

Post Reply
Marfleet
Milepost 1
Posts: 26
Joined: Wed Dec 15, 2010 11:04 am

Peter Hick's Class 222s gangway and wire connections

Post by Marfleet »

I wonder if anyone can help me with this problem. When I set up a class 222 consist the gangways and wires do not connect along the whole of the consist. I've downloaded the updated versions that Peter made and also have the original files for the extended and retracted gangways and wires.

I've tried to find answers to these problems on the forums and been unsuccessful. I've tried to change the config.txt so that the kuids are all the same. Sometimes the MCO and MSRMB coaches appear to have extended gangways and wires at one end of the coach but not the other. I never seem able to get the DMSO and DMFO's to extend their gangways.

Any suggestions and solutions would be greatly appreciated.

Marfleet
User avatar
alexfleming380
Past 500!
Posts: 519
Joined: Mon Sep 26, 2011 6:48 pm
Trainz Version: TS12
Trainz Build: 61388
Author KUID: 622162
Location: That wee hilly place above England

Re: Peter Hick's Class 222s gangway and wire connections

Post by alexfleming380 »

Try driving it in driver. I find that the wires and gangways are only retracted in surveyor.
Alex
Please, call me Alex.
Formerly known as afleming97
Marfleet
Milepost 1
Posts: 26
Joined: Wed Dec 15, 2010 11:04 am

Re: Peter Hick's Class 222s gangway and wire connections

Post by Marfleet »

Thanks, I'll try that and see what happens.

Marfleet
Marfleet
Milepost 1
Posts: 26
Joined: Wed Dec 15, 2010 11:04 am

Re: Peter Hick's Class 222s gangway and wire connections

Post by Marfleet »

Right, I tried your suggestion and it partially worked. I used the Hull trains and First Hull trains.

In driver the Hull Trains gangways were still retracted but the First Hull trains had gangways extended, apart from the connection between the MSMRB and the DSMO.

It looks like I'll just have to accept that I can't fix this problem unless anyone else has suggestions to solve it.

Marfleet
User avatar
danny109
Past 250!
Posts: 425
Joined: Sun Sep 18, 2011 7:38 am
Trainz Version: 2009, 2019
Trainz Build: 46653
Author KUID: 554607
Location: On the road again...

Re: Peter Hick's Class 222s gangway and wire connections

Post by danny109 »

I have the same problem, but I don't notice it much anyway.
Back in the Trainz saddle
User avatar
nicko6
New Starter
Posts: 1
Joined: Thu Apr 04, 2013 12:43 pm
Trainz Version: TS12
Trainz Build: 49922

Re: Peter Hick's Class 222s gangway and wire connections

Post by nicko6 »

Hi Marfleet,

The solution to your problem is posted here (Post #2 by nexusdj): http://forum.british-trainz.co.uk/viewt ... =Class+222

The cause of the problem is the same bug that affects the lights and wipers (from what I can gather), so following the guide in the link to correct it should also fix the gangway and wires. All you need to do is change a single line in the script file (Class222.gs) for each of the middle (non-cabbed) cars. I had the same problem with these units, and doing this fixed them for me (A big thanks to nexusdj by the way for discovering this solution).

I hope this helps
Tom
Marfleet
Milepost 1
Posts: 26
Joined: Wed Dec 15, 2010 11:04 am

Re: Peter Hick's Class 222s gangway and wire connections

Post by Marfleet »

Thanks Tom

I've made those changes and I'm pleased to report that I've got extended gangways.

I suggest danny109 tries this solution as well.

Great

Thanks

Bill :D
Post Reply