Hi everyone just wondering if anyone has any details on conflat loading yards.

Were containers delivered to manufactures and filled with good then transported to A loading yard or were they loaded at the yard and how were those yards arranged ?.


Cheers.
Image

Uploaded with ImageShack.us
User avatar
Nexusdj
Forum Veteran
Posts: 3097
Joined: Sun Dec 12, 2010 3:02 pm
Trainz Version: TRS22
Trainz Build: 123794
Author KUID: 45317
Location: West Midlands
Contact:

Re: Conflat loading

Post by Nexusdj »

The containers where usually loaded at the manufacturers then transported by road in most cases to a goods yard that had a suitable crane .
Some of the larger manufacturers may well of had there own sidings where the containers could of been loaded directly ?

http://paulbartlett.zenfolio.com/img/s/ ... 0732-3.jpg

http://www.brc-stockbook.co.uk/MetGCR_crane_no1-1.gif

http://www.nrm.org.uk/img/NRM/worksphot ... S_7933.jpg

http://www.pegnsean.net/~railwayseries/kevin-real.jpg

http://www.nrm.org.uk/img/NRM/worksphot ... S_6429.jpg
High visibility pixels must be worn when on or about the line !!
macneil
Past 250!
Posts: 384
Joined: Sun Dec 12, 2010 9:37 pm
Trainz Version: 2010
Location: cairns australia

Re: Conflat loading

Post by macneil »

Thanks Dave finished A fresh install today so hopefully back to route building soon :D