Index  •  FAQ  •  Search   •   Register | Login  

It is currently Sun Apr 22, 2018 8:14 am


Last visit was: style=

Post new topic Reply to topic  [ 7 posts ] 
 Peter Hicks MK4's 
Author Message
 Post subject: Peter Hicks MK4's
PostPosted: Thu May 30, 2013 11:04 am 
R.I.P
User avatar

Joined: Sun Dec 12, 2010 3:34 pm
Posts: 354
Location: Trowbridge, Wiltshire
Trainz Version: TS2009
Trainz Build: 41844
Author KUID: 0
I know this has been mentioned before but when I searched through the forum I couldn't find the thread :oops: What the problem is when I place down a GNER MK4 Coach in surveyor I get the following script error. Can some kind soul please help me on how to get rid of the said script error please :)

Here is the screenie of the script error:
Image


Offline
 Profile  
 
 Post subject: Re: Peter Hicks MK4's
PostPosted: Thu May 30, 2013 1:53 pm 
Forum Veteran
User avatar

Joined: Sun Dec 12, 2010 3:02 pm
Posts: 2568
Location: West Midlands
Trainz Version: TS12 & TANE
Trainz Build: 80330
Author KUID: 45317
Check the config to make sure that they're not set up as an engine ,
Code:
engine                                  0


Check the script file and make sure it says :
Code:
class mk4ic_po isclass Vehicle

if it say Locomotive change it to "Vehicle" but make sure you use a capital "V"

***Note that the entry mk4ic_po will be different for each coach***

_________________
High visibility pixels must be worn when on or about the line !!


Offline
 Profile  
 
 Post subject: Re: Peter Hicks MK4's
PostPosted: Thu May 30, 2013 3:58 pm 
R.I.P
User avatar

Joined: Sun Dec 12, 2010 3:34 pm
Posts: 354
Location: Trowbridge, Wiltshire
Trainz Version: TS2009
Trainz Build: 41844
Author KUID: 0
Done that and all is as you say it should be so I am at a loss :(


Offline
 Profile  
 
 Post subject: Re: Peter Hicks MK4's
PostPosted: Thu May 30, 2013 5:07 pm 
Forum Veteran
User avatar

Joined: Sun Dec 12, 2010 3:02 pm
Posts: 2568
Location: West Midlands
Trainz Version: TS12 & TANE
Trainz Build: 80330
Author KUID: 45317
Okay no probs , Plan B ....

Whats the kuid or kuids of the coaches that are flagging up the errors ?
What dependencies do they use ?

At some stage I have fixed peters Mk4's but I can't remember what I did (the script as a loco is always my first port of call these days) .

Thinking about it I believe (though I could be wrong) that Peters Mk4's have to be marshalled in the correct order so that the coach letter script works correctly .
I think there's a marshalling list on his website ?

_________________
High visibility pixels must be worn when on or about the line !!


Offline
 Profile  
 
 Post subject: Re: Peter Hicks MK4's
PostPosted: Thu May 30, 2013 6:09 pm 
Past 500!
User avatar

Joined: Mon Sep 26, 2011 6:48 pm
Posts: 518
Location: That wee hilly place above England
Trainz Version: TS12
Trainz Build: 61388
Author KUID: 622162
Nexusdj wrote:
Thinking about it I believe that Peters Mk4's have to be marshalled in the correct order so that the coach letter script works correctly .

Class 91 Loco - TOE - TO - TO - TO - TOD - SV - PO - PO - PO - DVT
Hope this helps ya ;)
Alex

_________________
Please, call me Alex.
Formerly known as afleming97


Offline
 Profile  
 
 Post subject: Re: Peter Hicks MK4's
PostPosted: Thu May 30, 2013 11:17 pm 
R.I.P
User avatar

Joined: Sun Dec 12, 2010 3:34 pm
Posts: 354
Location: Trowbridge, Wiltshire
Trainz Version: TS2009
Trainz Build: 41844
Author KUID: 0
That is correct I did place them down in that order, thanks for your response though :)


Offline
 Profile  
 
 Post subject: Re: Peter Hicks MK4's
PostPosted: Wed Mar 14, 2018 6:29 am 
Milepost 7
User avatar

Joined: Sat Apr 02, 2016 10:04 am
Posts: 84
Location: Nottinghamshire
Trainz Version: TS12
Trainz Build: 61383
Author KUID: 0
Sorry to bump an old thread but saves starting a new one for a similar topic.

I’ve created a route that is based on the GCR through Nottingham assuming it didn’t close and basing it on the Chiltern Railways model of operations. I want to use rakes of Mk4’s cascaded off the ECML for expresses between Sheffield Victoria and London Marylebone as it solves the disability access law, also as I liked the old GNER Libery and as the GCR was part of the LNER not to far fetched to have GNER as the routes operator!. (Nobody has produced plug door mk3’s yet). This is were I hit a problem.

As mentioned here unless you marshal the Mk4’s as a 2+9 set in the correct order it bugs because of the letter script. Is there any way of deleting or disabling this part of the script allowing a 2+6 formation of Class 67, TOE, TO, TO, TOD, SV, PO and DVT.

I thought I’d found a way of tricking the script by marshalling the rake correctly then deleting the unwanted coaches. Worked fine until a point in the AI programme were the consist changes direction and the bug is back.....

Help appreciated thanks.

_________________
Image


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 7 posts ] 


 Who is online 

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron

 
Index  |  FAQ  |  Search

phpBB skin developed by: John Olson
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group