PFX wrote:I note there are two slightly different layouts off the P2 road into P1 and the sidings. I can modify to either without any great problem.
Yes, I'm pretty sure the colour picture was
after the sidings next to P1 had been removed. Looks like they remodelled a reasonable amount of trackwork.
Actually looking at it again, I think what they did was remove the junction that the line from P2 connected to and instead connected the line from P2 to the junction that P1 originally came off, and then added a new junction in for P1 on this realigned track section. It also looks like they shaved the end off of P1/P2 to accommodate this. It's clearly more pointed in the colour image.